Job Title:
Site Executive
Projects / Site Operations
Project Manager / Site Incharge
Project Sites (Travel Required)
1–4 Years
Diploma / B.E. / B.Tech in Mechanical / Civil / Electrical Engineering
LUCKY-TECH Membranes Pvt Ltd is a leading manufacturer and solution provider in the field of technical textiles and membrane-based engineering solutions. The company specializes in PVC/PVDF-coated membrane structures, biogas balloon systems, tensile architecture, industrial fabric solutions, and customized project installations across India.
The company focuses on quality execution, innovation, safety, and customer satisfaction while delivering projects across industrial and infrastructure sectors.
The Site Executive will be responsible for supervising installation, commissioning, site coordination, quality checks, reporting, and execution activities for membrane and biogas projects at client locations. The role requires strong technical understanding, coordination skills, and execution monitoring to ensure timely and quality project completion.
Supervise site installation activities as per approved drawings and standards.
Coordinate with project managers, installation teams, vendors, and clients.
Ensure proper installation of membrane systems, blowers, piping, control panels, and related accessories.
Monitor site safety, quality standards, and work discipline.
Conduct installation inspections, pre-commissioning checks, and commissioning support activities.
Prepare Daily Progress Reports (DPRs), site reports, and installation checklists.
Ensure proper alignment, fitment, and quality of membrane installations.
Verify readiness of civil platforms and installation surfaces before execution.
Coordinate material movement, site readiness, and manpower planning.
Identify and escalate technical or execution-related issues on time.
Support testing, trial runs, and handover activities.
Maintain professional coordination with clients during execution.
Ensure completion of projects within timelines and quality standards.
Basic understanding of mechanical / civil / electrical systems
Ability to read engineering drawings
Site coordination and execution skills
MS Excel and reporting knowledge
Problem-solving and troubleshooting ability
Good communication and team coordination
Knowledge of installation and commissioning activities
Understanding of safety practices at project sites
Ownership mindset
Discipline and accountability
Positive attitude
Attention to detail
Team coordination ability
Time management skills
Willingness to travel and work at sites
Installation Checks
Platform top surface inspection
Surface cleaning and leveling verification
SS flat positioning, marking, and drilling supervision
Verification of no damage to civil structures
Installation supervision of:
Blowers
Control panels
Pressure transmitters
Level transmitters
Gas PVRV systems
Air and gas piping systems
Ground sheet placement supervision
Rubber gasket marking and punching
Membrane alignment inspection
Sikaflex application monitoring
SS flat installation checks
Fastener tightening verification
Logo positioning verification
Inspection of membrane condition and cleanliness
Soap water leak test
Electrical checks for blowers and panels
Start-stop functionality checks
View glass installation checks
Equipment inspection and verification
Blower operation testing
Calibration of pressure transmitters
Calibration of level transmitters
PVRV water level checks
Final installation verification
Client demonstration and handover support
Timely project execution
Installation quality compliance
Safety compliance at site
Accuracy of reporting
Reduction in installation rework
Client coordination and satisfaction
Site issue resolution efficiency
Requirements
Task list
A
INSTALLATION CHECKS
1
Preparedness of platform Top Surface
a.
Surface should not be uneven, debris free, no plaster on top
b.
Steel should be cut and top surface should be plain.
2
Positioning of SS Flats on top surface of Platform
a.
Positioning of SS Flats.
b.
Marking & Drilling of SS Flats.
c.
No damage to the Wall & top surface.
3
Installation of Accessories
a.
Blower: Foundation & Installation, as per Dwg
b.
c.
d.
Gas PVRV & Air damper: Installation.
e.
4
Membrane Placement
a.
Placing of the ground sheet
b.
Marking and punching of rubber gasket
c.
Ensure membranes are free of damage & properly aligned
d.
Cleanliness & dryness of Top Surface of ground sheet
e.
Position of Logo on Outer Membrane, as per Client
f.
Marking and punching of Inner balloon
g.
Marking and punching of outer balloon
h.
Applying Sikaflex between the rubber gasket & ground sheet
i.
Placement of SS Flats over Outer membrane
j.
Tightness of fastners with Hlti impact wrench
5
Visual Inspection of all Membranes & components
a.
Physical condition
b.
Installations & alignments
B
PRE COMMISSIONING CHECKS
1
Soap Water Leak Test
2
Blower Electrical check
3
Blower Start Stop action w.r.t. pressure Set point
4
Electrical panel
5
Installation of view glasss
C
STAGE CLEARANCE
Balloon is ready for Commissioning & Operation: Ok / Not Ok
For LTMPL Project supervisor
For Client Project Manager
D
COMMISSIONING CHECKS
1
Pre Requisites
a.
Power Availability Grid + DG set Backup Power + UPS Support
2
Commissioning Checks
a.
Visual Check of installation completion
b.
Blower On-Off Operation
c.
Calibration of Level transmitter
d.
Calibration of Pressure transmitter
e.
PVRV water level check
OVERALL CONCLUSION: Installation & Commissioning activities are completed & acceptable
OK / NOT OK
For LTMPL Project supervisor
For Client Project Manager
Sample responsibilities for this position include:
Responsible for knowledge of contracts, budget and
operational requirements
Enforces compliance of customer work standards, company
policy and procedures - Leads by example
Is able to establish effective relationships and
communications, both internally and externally, with persons of all backgrounds
and organizational levels
Accepts responsibility for his/her own performance and
demonstrates the capability to assist other team members in reaching success
within the organization and contributes to building a positive team environment
Mentors and trains new members of the team to meet or exceed
program standards
Tracks time sheets and attendance for assigned personnel
Prepares accurate, precise, and timely reports • Enforces
workplace security policies, procedures, and uniform standards
Executes guard mount briefings with clarity and command of
the subject matter
Possesses and demonstrates a positive approach toward
achieving outstanding customer satisfaction
Constantly seeks ways to improve and promote quality with
existing and/or future innovations
Giving top priority to Personnel and then property safety
Developing and managing best in class reporting


